Veteran-Owned | Licensed & Insured
CSLB #1108764 | DIR #1001134591
Northbound Cottonwood, CA
2025
4,100 sq. ft.
Quartz Epoxy (Satin Finish)
Scrape & Grind + Moisture Barrier
5 Days (Fri–Mon)
Light traffic: 24 hours, Full use: 72 hours
3
Northbound Cottonwood, CA
2025
4,100 sq. ft.
Quartz Epoxy (Satin Finish)
Scrape & Grind + Moisture Barrier
5 Days (Fri–Mon)
Light traffic: 24 hours
Full use: 72 hours
3
Northbound Cottonwood, CA
2025
4,100 sq. ft.
Quartz Epoxy (Satin Finish)
Scrape & Grind + Moisture Barrier
5 Days (Fri–Mon)
Light traffic: 24 hours
Full use: 72 hours
3
The Northbound Cottonwood CHP Weigh Station needed a complete flooring upgrade that could withstand heavy daily use while meeting strict durability and safety standards. With only a weekend to complete the project, our team delivered a high-performance quartz epoxy system that matched the southbound station’s appearance and reopened on schedule.
Client Goals:
Upgrade to a more durable, long-lasting flooring system
Complete project over a single weekend with no operational delays
Improve safety and compliance
Match aesthetics of the existing southbound station
Scrape and grind prep
Moisture barrier application
Double-broadcast quartz epoxy system (resin-based, no flake)
The primary challenge was the compressed schedule — the floor had to be installed over the weekend and ready for reopening Monday.
Despite this, our three-person crew completed the full 4,100 sq. ft. within five days, outperforming the previous contractor’s timeline by half.
We worked closely with Shawn from Northstate Painting, ensuring seamless communication and trade coordination.
Return to Service:
24 hours: Light foot traffic
72 hours: Full operational use
Key Outcomes:
Completed in half the time of the prior contractor
Long-lasting, low-maintenance surface
Aesthetic match to southbound station
Low-VOC materials and OSHA-compliant installation
5–10 year expected lifespan, with a 2–3 year limited warranty
Maintenance Benefits:
Easy cleaning (soap & water—no harsh chemicals)
Reduced downtime
Strong resistance to wear and impact
appearance and reopened on schedule.
Final Finish: Satin Quartz Epoxy
Prep Method: Scrape & Grind + Moisture Barrier
Expected Lifespan: 5–10 years
Warranty: 2–3 Year Limited Warranty
Maintenance: Mop with soap and water; low upkeep
Delivered On Time: ✔ Yes
Get a High-Performance Flooring System That Stands Up to Real-World Use.
Serving commercial polished concrete clients across Redding, Anderson, Chico, Cottonwood, Red Bluff, Palo Cedro & Shasta Lake.
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
These cookies are needed for adding comments on this website.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyzes website traffic for informed marketing decisions.
Service URL: business.safety.google (opens in a new window)
Jetpack's built-in visitor analytics. It records page views, referring sites, search terms, and outbound link clicks, and also carries the shared visitor-tracking library used by Jetpack Instant Search and WooCommerce Analytics.
Service URL: automattic.com (opens in a new window)
Google reCAPTCHA helps protect websites from spam and abuse by verifying user interactions through challenges.
You can find more information in our Cookie Policy and .